Temporary path closure
Temporary closures
For safety reasons we sometimes have to close paths during repairs, improvements or construction work. Longer term closures (21 days or more) can be viewed on our online map. All our current closures are listed below.
If you are planning work which affects a public right of way, you can also,
Please also see our list of,
Current closures
Please note: we know that some of these files might not be suitable for users of assistive technology.
Therefore if you need a file in an accessible format, please contact us. It will help us if you say what assistive technology you use. We will then contact you about the next step.
- Telephone: 0345 6080 193
- Email: Rights of Way
Short-Term temporary Closures
The following is a list of Public Rights of Way that have been temporarily closed on a short term basis, either for a period of 5 days (followed by a possible second 5-day period immediately after) or a period of 21 days (followed by a possible second 21-day period immediately after).
5-day closures
- None at present.
14-day closures
- None at present.
21-day closures
- Battle Bridleway 67b [743.1 KB] [pdf] Closed during works to stream bank.
- Ditchling Footpath 50a (part) [288.8 KB] [pdf] Closed to protect public safety due to suspected unsafe trees.
- Framfield Bridleway 42c, 42d, 42e [612.0 KB] [pdf] Closed for surface improvements at Tickerage Mill. (This Closure affects the Weald Way and Vanguard Way).
42-day closures
- None at present
Long-Term temporary Closures
The following is a list of Public Rights of Way that have been temporarily closed for a longer period of time using a temporary Traffic Regulation Order (TRO), initially lasting for 6 months which can be extended by agreement with The Planning Inspectorate.
- Battle Footpath 76 [2.4 MB] [pdf] Closed during a housing development.
- Bexhill Footpath 138 [2.1 MB] [pdf] Closed during the construction of a housing development.
- Burwash Footpath 36 [1.2 MB] [pdf] Closed due to flood damage to bridge.
- Buxted Footpath 24 [633.7 KB] [pdf]. Closed due to a bank slippage.
- Camber Footpaths 3a, 8, 19a, 19b and also East Guldeford Footpaths 13a, 13b, Playden Footpaths 20b, 20c, and Rye Footpaths 6 and 7. [2.6 MB] [pdf] Closed for river embankment raising works.
- Camber Footpaths 3b, 3c, 9a, 9b, 10 [1.3 MB] [pdf] Closed for river embankment raising works.
- Chailey Byway 8c,8d,8e,8f,8g,8h,8i (part) [269.7 KB] [pdf]. Closed due to a dangerous bridge. Open to all users except vehicles and horse drawn carriages until repairs begin.
- Crowborough Footpath 15a [2.6 MB] [pdf] Closed during a housing development.
- East Guldeford Footpaths 13a, 13b, and also Camber Footpaths 3a, 8, 19a, 19b , Playden Footpaths 20b, 20c, and Rye Footpaths 6 and 7. [2.6 MB] [pdf] Closed for river embankment raising works
- East Hoathly with Halland 1a (part) [2.0 MB] [pdf] Closed during a housing development.
- Ewhurst Footpath 1 [2.3 MB] [pdf]. Closed due to river bank failure.
- Forest Row Footpath 13a [912.3 KB] [pdf] Closed due to flood damage to bridge.
- Hailsham Footpath 50 (part) [1.7 MB] [pdf] Closed during the construction of an access road for a housing development.
- Hailsham Footpath 61b (part) [842.8 KB] [pdf] Closed during construction works
- Hailsham Footpath 73 [2.4 MB] [pdf] Closed for housing development.
- See also Hellingly Footpaths 4a (part), 5b, 6a, 7c. - Hastings Footpath 58a [396.9 KB] [pdf] Closed due to subsidence.
- Hastings Footpath 145 (part) [2.5 MB] [pdf] Closed during a housing development. Hastings TRO to follow [2.4 MB] [pdf]
- Hellingly Footpaths 4a (part), 5b, 6a, 7c [2.4 MB] [pdf] Closed for housing development.
- See also Hailsham Footpath 73. - Hellingly Footpath 7a [2.1 MB] [pdf] Closed for housing development.
- Lewes Footpath 4b (part) [1.8 MB] [pdf] Closed during the creation of a wetland.
- Little Horsted Footpath 3 [329.6 KB] [pdf]. Closed during development works.
- Ninfield Footpath 14a (part) [2.7 MB] [pdf] Closed during a housing development. Ninfield TRO to follow [2.6 MB] [pdf]
- Playden Footpaths 20b, 20c, and also Camber Footpaths 3a, 8, 19a, 19, East Guldeford Footpaths 13a, 13b, and Rye Footpaths 6 and 7. [2.6 MB] [pdf] Closed for river embankment raising works.
- Rye Footpaths 6 and 7, and also Camber Footpaths 3a, 8, 19a, 19, East Guldeford Footpaths 13a, 13b and Playden Footpaths 20b, 20c. [2.6 MB] [pdf] Closed for river embankment raising works.
- Uckfield Footpaths 10b (part) and 11 (part) [332.1 KB] [pdf]. Closed during development works.
- Further information [448.5 KB] [pdf]. - Wadhurst Footpath 13d [397.3 KB] [pdf]. Closed awaiting bridge replacement.
- Wadhurst Footpath 27d. [2.2 MB] [pdf] Closed due to flood damage to bridge.
- Westfield Footpaths 33a, 33b (part), 34b, 34c [2.6 MB] [pdf]. Closed during the construction of a housing development.
- Westham Footpath 33 [2.3 MB] [pdf]. Closed during the construction of a housing development.