Temporary path closure


Temporary closures

For safety reasons we sometimes have to close paths during repairs, improvements or construction work. Longer term closures (21 days or more) can be viewed on our online map. All our current closures are listed below.

If you are planning work which affects a public right of way, you can also, 

Please also see our list of, 

Current closures

Please note: we know that some of these files might not be suitable for users of assistive technology. 

Therefore if you need a file in an accessible format, please contact us. It will help us if you say what assistive technology you use. We will then contact you about the next step.

Short-Term temporary Closures

The following is a list of Public Rights of Way that have been temporarily closed on a short term basis, either for a period of 5 days (followed by a possible second 5-day period immediately after) or a period of 21 days (followed by a possible second 21-day period immediately after).

5-day closures

  • None at present.

21-day closures

  • Hailsham Byway 57 [1.3 MB] [pdf] Closed to protect the surface from further damage. See also Pevensey Byway 17. To be followed by a Successive 21 day [1.3 MB] [pdf] closure.
  • Pevensey Byway 17 [1.3 MB] [pdf] Closed to protect the surface from further damage. See also Hailsham Byway 57. To be followed by a Successive 21 day [1.3 MB] [pdf] closure.

Longer-Term temporary Closures

The following is a list of Public Rights of Way that have been temporarily closed for a longer period of time using a temporary Traffic Regulation Order (TRO), initially lasting for 6 months which can be extended by agreement with The Planning Inspectorate.