Works and activities that do require consent



All permanent and/or temporary works that could impact the flow of water within the watercourse, including:

  • Changes to an existing culvert (pipe) including but not limited to:
    • Replacement of pipe.
    • Alterations in length.
    • Alterations in pipe diameter.
  • Changes to an existing channel including but not limited to:
    • Rerouting.
    • Realignment.
    • Removal.
    • Culverting.
  • Introduction of any new structure that extends into the channel or culvert including but not limited to:
    • Bridges.
    • Weirs.
    • Natural flood management dams/barriers.
    • Headwalls.
    • Pipe/services crossing.
    • Erosion protection.
  • Introduction or changes to a structure designed to contain or divert flood water.
  • Dredging, raising, or removing any material (this does not include desilting works where material is removed only to the natural bed level of the channel).
  • Pre-planned emergency response activities (such as planning to use a temporary freestanding barrier in a set location when a flood warning is issued).