Current Status
Construction is due to commence on 1 September 2026.
Stay up to date with the latest project progress and photos
Explore the full project timeline
Background and Overview
The A259 Seaford Road and Denton Corner form a key section of the A259 through Newhaven, providing access to local communities, employment areas and key destinations. The area experiences high traffic volumes, particularly during peak periods, which can affect bus journey times and reliability.
The A259 Newhaven Denton Corner Bus Priority Scheme aims to improve bus journey times and reliability along this route, making bus travel a more attractive and dependable option for residents and visitors.
The scheme forms part of a wider programme of bus priority improvements across East Sussex and supports the objectives of the East Sussex Local Transport Plan 4 (LTP4) and the East Sussex Bus Service Improvement Plan (BSIP). It is being delivered using Department for Transport (DfT) funding through the BSIP programme.
What are we doing?
Bus Interchange
- Creation of a new bus interchange at Denton Corner between Denton Roundabout and Mount Road Service Road to improve access to bus services and support more reliable journeys.
- Introduction of new bus stops and passenger facilities within the interchange to improve accessibility and support a wider range of bus services, including routes that do not currently serve Denton Corner.
- New pedestrian and cycle facilities through the interchange to improve connectivity and access for all users.
Bus Priority Measures
- Introduction of new bus lanes on the A259 Seaford Road approach to Denton Roundabout and around the roundabout itself to improve bus journey times and reliability.
- Bus lanes will also be available for use by cyclists and licensed hackney carriage taxis to support safer and more efficient journeys.
Traffic Management Changes
- Introduction of new waiting restrictions on parts of Mount Road and Station Road to improve visibility, maintain access and support the safe operation of bus services.
- Introduction of new one-way traffic arrangements within the bus interchange to improve traffic circulation and road safety.
- Extension of the existing 40mph speed limit on A259 Seaford Road to support the revised highway layout and improve road safety.
Project Timeline
Current Status
Construction is due to commence on 1 September 2026.
Stay up to date with the latest project progress and photos
Explore the full project timeline
Project Timeline
1. Feasibility and Option Development (2022 - 2024)
Initial feasibility work identified the need to improve bus journey times and reliability along the A259 corridor at Denton Roundabout, Newhaven. Options were developed and refined during this stage.
2. Public Consultation (July - September 2023)
A public consultation was carried out to gather feedback on early proposals, including bus priority measures and changes to the road layout. Following consultation, approval to progress the scheme was granted by the County Council's Lead Member for Transport and Environment in January 2024.
3. Preliminary Design (2024 - 2025)
The scheme was developed through preliminary design, with updates made in response to consultation feedback and ongoing technical work. The proposals were refined following further assessments, including of the bus priority benefits.
4. Informal Traffic Regulation Order (TRO) Pre-Consultation (December 2024 - January 2025)
An informal pre-consultation on the draft Traffic Regulation Order (TRO) measures was undertaken to gather stakeholder feedback on proposals including bus lanes, changes to the bus interchange, waiting restrictions and speed limit changes.
5. Formal Traffic Regulation Order (TRO) Consultation (January - February 2026)
The formal Traffic Regulation Order (TRO) consultation was carried out to advertise the proposed changes and consider representations before progressing the scheme. The responses received during the consultation were considered at the 18 March 2026 Planning Committee, which supported officers' recommendation to implement the changes as proposed within the Traffic Regulation Order.
6. Detailed Design (2025 - 2026)
Following completion of the preliminary design stage, the detailed design stage supported the development of the scheme to construction level, including final layouts and technical design. Alongside this, our delivery partner Balfour Beatty Living Places (BBLP) undertook pre-construction activities to support the ongoing progression of the scheme.
7. Tree Consultation (May - June 2026)
A tree consultation was carried out regarding the proposed removal of trees and vegetation required to facilitate the scheme. Following the consultation, the Local Highway Authority approved the proposal to remove the affected trees and vegetation. Replacement tree planting is proposed to help offset the loss.
8. Upcoming – Construction (September - November 2026)
Construction is due to commence on 1 September 2026.
Project Updates and Phases
Latest Progress Updates
This page will be updated regularly throughout construction to keep you informed on progress. Updates will include photos, phasing plans and a summary of the work completed, helping you see how the scheme is developing on site.
Frequently Asked Questions (FAQs)
FAQ
The Project
What is the Denton Corner BSIP scheme?
The scheme is part of East Sussex's Bus Service Improvement Plan (BSIP) and aims to improve bus reliability, safety and accessibility at Denton Corner, Newhaven.
Why is the scheme being delivered?
- The scheme is intended to help make bus journeys through Newhaven more reliable by reducing delays at key points on the network.
- Improvements are designed to support safer and easier journeys for bus users, pedestrians, cyclists and other road users.
- Better access and upgraded facilities are intended to help people travel more easily to jobs, education, healthcare and local services.
- By encouraging public transport and active travel, the scheme supports wider goals to reduce congestion, improve air quality and lower carbon emissions.
- The works are part of the wider Bus Service Improvement Plan programme, which aims to make bus travel a more practical and attractive choice for local journeys.
Who is delivering the scheme?
The scheme is being delivered by East Sussex Highways (ESH), a partnership between Balfour Beatty Living Places and East Sussex County Council (ESCC).
Who is funding the scheme?
The scheme is being funded through East Sussex County Council's Bus Service Improvement Plan (BSIP) funding allocation, which was awarded by the Department for Transport (DfT) to support improvements to bus services and infrastructure across East Sussex. The funding is specifically allocated for bus improvement measures and cannot be used for other purposes such as general highway maintenance or unrelated transport projects.
How have these proposals been developed?
These proposals are based on traffic surveys, technical assessments, transport modelling and independent Road Safety Audits. They aim to strike a fair balance between the needs of all road users, including businesses, residents and public transport users, while supporting the objectives of the East Sussex Bus Service Improvement Plan and Local Transport Plan 4 (LTP4).
East Sussex County Council are committed to working closely with the local community and businesses to ensure the scheme delivers benefits for everyone, and that any concerns are considered as the project progresses.
Has there been a consultation on the scheme?
Yes. Public consultation and stakeholder engagement have been undertaken as part of the development of the scheme. Feedback from residents, businesses and other interested parties has been considered alongside technical assessments, road safety audits and transport modelling in the development of the proposals.
How will bus users benefit from the scheme?
The scheme introduces bus priority measures designed to reduce delays and improve the reliability of bus services. By providing more consistent journey times, particularly during peak periods, the scheme aims to make bus travel a more attractive and dependable option.
The new Denton Corner interchange has been designed to support a wider range of services to stop in the area, including routes that do not currently serve the existing Denton Corner stop. The revised layout is also intended to provide a more direct route for buses, helping to improve journey times and reliability for passengers.
How will the scheme affect road users in the area?
The scheme includes changes to the highway layout at Denton Corner, including a new bus interchange, new bus lanes, parking restrictions and revised traffic arrangements. Some drivers may need to adjust to changes in lane use and vehicle movements through the area.
The proposals have been developed to improve bus reliability and accessibility while maintaining access for residents, businesses and other road users.
What impact will the proposed BSIP scheme have on congestion in the area?
Traffic surveys were undertaken in June 2024 and Sept 2024 across the scheme area and were used to develop a microsimulation model of traffic conditions. This modelling helped assess how the proposed changes are expected to affect key routes and junctions.
The results indicated that the network can continue to operate effectively while delivering improvements to bus journey times and reliability. The scheme has been designed to provide bus priority benefits while minimising impacts on general traffic.
What changes are being made at Denton Corner?
The scheme includes a new bus interchange between Denton Roundabout and Mount Road Service Road, together with new bus stops, bus lanes and associated pedestrian and cycle facilities.
The new arrangement will improve access to bus services in the area and support more reliable bus journeys through Denton Corner.
Why are parking restrictions being introduced on Mount Road and Station Road?
The proposed "No Waiting at Any Time" restrictions are intended to ensure that buses and other larger vehicles can travel safely through sections of road where parking can reduce visibility or restrict available carriageway width.
The restrictions will help reduce conflicts between parked vehicles and moving traffic while supporting the safe and reliable operation of bus services.
How will pedestrians benefit?
The improvements are intended to help create a safer and more accessible environment through upgrades to crossings, footways and public spaces.
How have safety and accessibility been considered?
The scheme has been developed using technical assessments and independent Road Safety Audits to help ensure it operates safely for all road users.
Accessibility has also been considered throughout the design process. The layout includes pedestrian routes and crossing facilities through the Denton Corner interchange, while taking account of local pedestrian movements and the needs of different users.
How will cyclists benefit from the scheme?
Cyclists will be permitted to use the bus lanes, allowing them to travel separately from general traffic for sections of their journey. This can help improve comfort and safety when travelling through the area.
The scheme also includes shared pedestrian and cycle routes through the Denton Corner interchange, with crossing facilities provided to maintain connectivity through the area. Cycling has been considered as part of the overall design to help balance the needs of all road users.
Will taxis and private hire vehicles be permitted to drive in the bus lane?
Licensed hackney carriage taxis will be permitted to use the bus lanes alongside buses and cyclists. Private hire vehicles will not be permitted to use the bus lanes.
Restricting access to authorised vehicles helps ensure the bus lanes operate effectively, supporting reliable bus journey times and reducing delays.
How will bus lanes be enforced?
Bus lane restrictions will be enforced in accordance with the Traffic Management Act 2004. Where CCTV enforcement is used, recorded images are reviewed before any Penalty Charge Notice is issued. For more information about bus lane enforcement in East Sussex, please visit the ESCC Bus lane Enforcement web page.
Will emergency vehicles be permitted to use the bus lanes?
Yes. Emergency service vehicles will be permitted to use the bus lanes when responding to incidents or emergencies.
How will the scheme support the environment?
By encouraging the use of public transport and active travel, the scheme supports wider objectives around reducing congestion, improving air quality and supporting carbon reduction.
Why are trees being removed as part of the scheme?
To accommodate the new Denton Corner bus interchange, changes to the existing highway layout are required within the vegetated areas around Mount Road. As a result, 14 trees and some vegetation have been identified for removal to provide space for essential bus, pedestrian and cycle infrastructure. To mitigate this loss, the scheme includes the planting of 17 new trees, together with additional landscaping and planting throughout the area.
Throughout the design process, the layout was refined to minimise impacts on existing trees wherever possible.
The trees proposed for removal are predominantly young, low-quality specimens located within dense unmanaged vegetation. No suitable alternative design was identified that would avoid their removal while still delivering the required bus interchange.
How has wildlife been considered?
Ecological assessments have been undertaken as part of the scheme design process to identify any potential impacts on habitats and protected species.
The findings have informed the design and will help ensure that appropriate mitigation measures are implemented where required.
What impact will the scheme have on air quality?
The scheme is not expected to result in traffic impacts significant enough to require a separate air quality assessment under current national guidance.
How will local businesses be affected?
East Sussex County Council recognises the importance of maintaining access to local businesses during both construction and operation of the scheme.
The scheme is intended to improve access to public transport and connectivity within the area, while access for customers, deliveries and servicing activities will be maintained. Construction activities will be carefully planned to minimise disruption wherever possible.
Construction
Where are the improvements taking place?
The Newhaven BSIP programme includes improvements in key locations, including:
- The Drove
- Avis Road
- Mount Road
- Station Road
What improvements are being made?
Depending on the location, works may include:
- New or improved bus lanes
- Road and junction improvements
- Traffic signal upgrades
- Road resurfacing
- Improved pedestrian crossing facilities
- Accessibility enhancements
- Improvements to cycling infrastructure
How long will the works take?
We’re currently planning on undertaking these improvements between Autumn 2026 and Winter 2026.
Construction programmes will vary depending on the location and phase of works. Information on timings and delivery phases will be shared with residents, businesses and other stakeholders ahead of construction. Information will also be available on the project webpages.
View the latest updates on the Denton Corner Avenue Bus Priority Scheme in Newhaven on the East Sussex County Council website.
View the latest updates on the Bus Service Improvement Plan schemes in Newhaven on the East Sussex Highways website.
What will the working hours be?
Working hours will vary depending on location and phase of works, using both daytime and nighttime working. For the majority of the work, roads will remain open with temporary traffic lights in place as the team will be working on the verges, however there will be times where a lane closure will be in place.
More information will be shared with affected properties and businesses once dates and times are confirmed.
View the latest updates on the Denton Corner Avenue Bus Priority Scheme in Newhaven on the East Sussex County Council website.
View the latest updates on the Bus Service Improvement Plan schemes in Newhaven on the East Sussex Highways website.
Will there be much noise?
Properties and businesses close to the carriageway may experience a temporary disturbance as work of this nature can be a noisy process and the affected parties may experience flashing lights and reversing sirens.
Wherever possible, we aim to keep noise to a minimum. During overnight works, noisier activities are completed before 11pm to keep disruption to a minimum. Site associated noise will still be present after this time.
Road closures and traffic management
Will there be disruption?
Some temporary disruption is unavoidable while the works are carried out. Traffic management measures may include temporary traffic signals, lane closures or changes to traffic movements. We aim to minimise disruption wherever possible.
View the latest updates on the Denton Corner Avenue Bus Priority Scheme in Newhaven on the East Sussex County Council website.
View the latest updates on the Bus Service Improvement Plan schemes in Newhaven on the East Sussex Highways website.
Will I still be able to access my property during construction?
Yes. Access to homes and businesses will be maintained wherever possible. If temporary restrictions are required for safety reasons, advance notice will be provided.
Will local businesses remain open during construction?
Yes. Businesses will remain open during construction unless otherwise advised. We will work closely with businesses to minimise disruption and maintain access where possible.
Will emergency services have access during construction?
We will liaise with emergency services throughout the works to help ensure access is maintained.
Will bus services continue to operate?
The aim is to keep bus services running throughout the works. If any temporary changes are required, these will be communicated in advance.
Communications and updates
Where can I find more information?
Further information will be published through East Sussex Highways and East Sussex County Council communication channels as the scheme progresses.
I have a question or concern. Who should I contact?
If you have a question about the scheme or would like to join the mailing list for updates, please contact East Sussex Highways at
Glossary
Glossary
Scheme
The set of planned improvements being delivered, in this case the Denton Corner Bus Priority Scheme in Newhaven.
A259
A key road that runs along the south coast, connecting towns and communities, including the section which runs through Newhaven.
Bus Service Improvement Plan (BSIP)
A government-funded programme developed by local authorities and bus operators to improve bus services, including reliability, journey times, and passenger experience.
Feasibility
Early-stage work to assess whether a scheme is viable. This includes identifying problems, developing potential solutions, and considering impacts and constraints.
Preliminary Design
An intermediate design stage where initial proposals are developed in more detail, often incorporating feedback from consultation and technical assessments.
Detailed Design
The final stage of design where all technical details are completed, including layouts, materials, and construction requirements, ready for construction delivery on site.
Construction
The stage when the planned improvements are built on site. This may include roadworks and temporary changes to traffic or access while the works are completed.
Public Consultation
A process where members of the public, businesses, and stakeholders are invited to give feedback on proposed changes before decisions are made.
Traffic Regulation Order (TRO)
A legal document used by the local authority to manage how roads are used. TROs are required to introduce changes such as bus lanes, parking restrictions, or turning restrictions.
Traffic Regulation Order Pre-Consultation (Informal Consultation)
An informal stage carried out before the legal process, used to gather early feedback on proposed traffic regulation changes.
Traffic Regulation Order Consultation (Formal Consultation)
The statutory process where proposed Traffic Regulation Orders are formally advertised and the public can submit comments or objections.
Planning Committee
A committee of elected councillors who review specific proposals, including unresolved objections to Traffic Regulation Orders, and resolve to support or reject officer recommendations.
Tree Consultation
A consultation process to gather feedback on proposals affecting trees, such as removal or changes, including environmental considerations.
Road Space Booking
A process to coordinate and schedule roadworks to minimise disruption, ensuring that different works across the network do not conflict with each other.
Phasing Plans
Plans showing how construction will be carried out in stages to minimise disruption and maintain access during the works.
Bus Priority Measures
Changes to the road layout or traffic management designed to give buses priority over other vehicles, helping to reduce delays and improve journey time reliability.
Bus Lane
A lane reserved primarily for buses, helping them move more quickly through congested traffic.
Bus Interchange
A location where passengers can access bus services, change between routes and use supporting facilities such as bus stops, shelters, pedestrian routes and cycle connections.
Journey Time Reliability
A measure of how consistently a journey takes the same amount of time. Improvements aim to make bus journeys more predictable.
No Waiting at Any Time Restriction
A restriction that prevents vehicles from waiting on a section of highway at any time. These restrictions are used to help maintain visibility, improve traffic flow and support the safe operation of the road network.
Loading Restrictions
Controls on when and where vehicles can stop to load or unload, helping to reduce congestion and keep traffic moving.
Journey Time Reliability
A measure of how consistently a journey takes the same amount of time. Improvements aim to make bus journeys more predictable.
Want to know more?
General Enquiries
If you have any queries about the scheme or would like to provide feedback, please contact our contact centre on 0345 60 80 193 who will pass your query to the team or email: