1. Home
  2. Roads and transport
  3. Cycling and Walking
  4. Local Cycling and Walking Infrastructure Plan (LCWIP)

Local Cycling and Walking Infrastructure Plan (LCWIP)

The East Sussex Local Cycling and Walking Infrastructure Plan (LCWIP) sets out proposed cycling and walking networks and measures within specific areas of the County. At this stage the plan indicates a potential alignment of a route. It does not contain detailed proposals.

The LCWIP focusses on areas of the County where there are the greatest opportunities to increase levels of cycling and walking. There is an emphasis on delivering infrastructure improvements which supports people who do not cycle or walk.

Having a plan in place will put us and our partners in a stronger position to secure future investment towards walking and cycling improvements.

For an accessible copy of the LCWIP please e-mail Cycling and Walking 

LCWIP Summary Document [3.2 MB] [pdf]

LCWIP Part 1 Strategy [2.6 MB] [pdf]

LCWIP Part 2 Infrastructure Plan [10.2 MB] [pdf]