Local Transport Plan 3 (2011-2026)

Our third Local Transport Plan (LTP3) sets out how we plan to improve transport and maintain the roads between 2011 and 2026.

We asked for your comments on:

These consultations closed on 4 January 2011.

The bulletin below sets out the requirements and timescales for the LTP3 and was sent to key groups and organisations for their views.

Environmental assessment

A Strategic Environmental Assessment (SEA) was carried out, to ensure that environmental issues are taken into account. The first stage is a Scoping Report which can be downloaded, below.

The results of this report can be downloaded as part of the consultation on the Draft Local Transport Plan 3 – 2011–2026.