We asked for your comments about our proposals to introduce traffic calming along Milward Road and Manor Road, Hastings that will:
- slow down traffic
- provide improvements for pedestrians.
Consultation results
Your comments showed support for the scheme, which favoured an amended version of Option 2. Both the consultation drafts and final versions of the designs can can be downloaded, below.
A summary of the results of this consultation is available in the minutes of the Lead Member for Environment and Transport meeting on 6 October 2009.
Further information and next steps
Funding is available for this scheme and the traffic regulation orders are being advertised. Construction of the scheme is expected to begin in September 2011.
We receive lots of requests for traffic calming schemes in East Sussex. Find out more about how we prioritise schemes on our page about Traffic calming.
For more details about these proposals, please contact Nigel Bodle.
Phone: 01323 463967.
| Acrobat (PDF) |
- Final scheme design - Manor Road (1129k)
- Main traffic calming features along Manor Road.
|
- Final scheme design - Milward Road (1) (799k)
- Main traffic calming features along Milward Road, between number 138 and Milward Crescent.
|
- Final scheme design - Milward Road (2) (748k)
- Milward Road between Milward Crescent (north end) and Wellington Road.
|
- Draft overview map of the proposals (2008k)
- High level map showing proposed traffic calming locations along Milward Road and Manor Road, Hastings.
|
- Section A - option 1 (1444k)
- Carriageway narrowing at the junction with St Mary's Road and Manor Road, and the Braycastle Walk pedestrian crossing.
|
- Section A - option 2 (1479k)
- Raised areas and carriageway narrowing at the junction with St Mary's Road and Manor Road, and the Braycastle Walk pedestrian crossing.
|
- Section B - option 1 (1590k)
- Build-outs at the Nelson Road and Milward Crescent junctions, road narrowing and bus stop improvements.
|
- Section B - option 2 (1579k)
- Speed cushions, build-outs at the Nelson Road and Milward Crescent junctions, road narrowing and bus stop improvements.
|
- Section C - option 1 (1409k)
- Build-outs at the junction with Milward Crescent, a new traffic island and bus stop improvements.
|
- Section C - option 2 (1469k)
- Speed cushions, build-outs at the junction with Milward Crescent, a new traffic island and bus stop improvements.
|