Traffic calming in Herstmonceux

We asked for your comments about proposals to introduce a traffic calming scheme through Herstmonceux that will:

  • slow down traffic
  • provide improvements for pedestrians.

The proposed plans were displayed in our exhibition bus in the car park of the Woolpack Inn on 18–19 November and afterwards at the Village Information Centre. You can view these plans below.

Results of this consultation are available to download below. The deadline for comments was 5 December 2005.

For further information, please contact Darren Atkinson:
Phone: 01273 481362

Acrobat (PDF)
Consultation results (9k)
Results of the consultation about traffic calming on the A271, at Herstmonceux.
Introduction (59k)
More details about the consultation in general.
The proposals (58k)
Information about the aim of the scheme and our proposals.
What happens next? (61k)
More details about sending us your comments and what happens next.
Overview map of all proposals (583k)
See a map of the location of each proposal or examine each proposal in more detail, below.
Proposal 1 - option A (86k)
New 30mph speed limit with 40mph buffer.
Proposal 1 - option B (160k)
Additional emphasis on existing 30mph limit.
Proposal 2 (57k)
Carriageway narrowing.
Proposal 3 (73k)
Proposed carriageway narrowing and crossing point.
Proposal 4 - option A (90k)
Mini Roundabout.
Proposal 4 - option B (73k)
Junction Realignment.
Proposal 5 - option A (113k)
Proposed kerb build-out crossing point outside the Post Office.
Proposal 5 - option B (105k)
Proposed kerb build-out crossing point outside the Sundial Restaurant.
Proposal 6 (95k)
Vehicle activated sign.