Planning Committee – 6 August 2008

County Hall at 10.30am

Acrobat (PDF)
Agenda
Minutes
Item 5A - Linear site following the alignment of a proposed wastewater transfer tunnel between east Saltdean on the county boundary and the mean low water mark at Friars Bay, east of Peacehaven – LW/537/CM(EIA)
A new wastewater treatment works and sludge recycling centre at Peacehaven, wastewater flow transfer infrastructure from east Saltdean to the proposed wastewater treatment works and onward to a new long sea outfall at Friars Bay, a new pumping station at Portobello in Telscombe Cliffs, sewer connections and access shafts. Linear site following the alignment of a proposed wastewater transfer tunnel between east Saltdean on the county boundary and the mean low water mark at Friars Bay, east of Peacehaven – LW/537/CM(EIA)
Item 5a - Appendix 1
Item 5a - Appendix 2
Item 5b - Pumping station compound, fenced, with Motor Control Centre (MCC) kiosk, covers to underground structures and new access track; second pumping station with MCC kiosk , covers to underground structures and associated access; wastewater treatment works, fenced with new access track and; a temporary construction compound. Land in and around Rushlake Green comprising agricultural land to the rear of the Horse and Groom Public House; highway land at the south end of Back Lane; land adjacent to Clippenham Stream, Stream Cottage and Stream Farm; land adjacent to Sparetime Cottage, Rushlake Green – WD/545/CM
Pumping station compound, fenced, with Motor Control Centre (MCC) kiosk, covers to underground structures and new access track; second pumping station with MCC kiosk , covers to underground structures and associated access; wastewater treatment works, fenced with new access track and; a temporary construction compound. Land in and around Rushlake Green comprising agricultural land to the rear of the Horse and Groom Public House; highway land at the south end of Back Lane; land adjacent to Clippenham Stream, Stream Cottage and Stream Farm; land adjacent to Sparetime Cottage, Rushlake Green – WD/545/CM
Item 5c - To vary Condition 4 (category of waste) of planning permission LW/265/CM to continue to allow inert category A and B waste and to include category C waste to be transferred and processed at the site. Rabbit Site, North Quay, Newhaven – LW/539/CM
To vary Condition 4 (category of waste) of planning permission LW/265/CM to continue to allow inert category A and B waste and to include category C waste to be transferred and processed at the site. Rabbit Site, North Quay, Newhaven – LW/539/CM
Item 6a - Construction of Multi use games area, Hertsmonceux Recreation Ground, Hertsmonceux
Construction of Multi Use Games Area. Herstmonceux Recreation Ground, Herstmonceux – WD/2667/CC
Item 6B - Provision of Multi use Games Area on space currently used for playground at New Horizons School, Tile Barn Road, St Leonards on Sea
Provision of a Multi Use Games Area (MUGA) on space currently used for playground at New Horizons School, Tile Barn Road, St Leonards on Sea – HS/2704/CC